top of page
Chapman-Taylor-Modular-Construction-LR1.

Maximizing Efficiency in Modular Manufacturing: A Process Optimization Success Story

The Challenge: A Complex, Inefficient Business Process

A consortium of 20+ modular manufacturing facilities struggled with a legacy business process that was inefficient, outdated, and insufficient for managing complex, large-scale construction projects. From lead generation to project completion, inefficiencies slowed the entire pipeline, limiting growth and profitability.

​

The Solution: Lean Six Sigma Process Mapping & Optimization

Using Lean Six Sigma principles, I conducted a comprehensive end-to-end process mapping initiative:

  • Performed in-depth qualitative interviews with sub-process owners to uncover inefficiencies and hidden roadblocks.

  • Mapped the entire business process, detailing inputs, outputs, dependencies, sub-process timing, and critical handoffs to gain full operational visibility.

  • Analyzed bottlenecks, delays, and inefficiencies, identifying areas for compression and streamlining.

  • Designed an optimized process map, reducing handoffs, eliminating waste, and improving coordination across manufacturing sites.

 

The Results: An 80% Reduction in Business Development Cycle Time

  • Lead-to-Win time reduced by over 80%, accelerating revenue generation.

  • Improved cross-facility coordination, ensuring projects move seamlessly from sales to production.

  • Enhanced visibility across the entire pipeline, enabling proactive management and decision-making.

 

The Competitive Advantage: Faster Sales, Faster Projects, Greater Profitability

By optimizing the full business development process, my client dramatically increased efficiency, reduced delays, and positioned itself for scalable growth.

Want to accelerate your modular construction pipeline and maximize throughput?

bottom of page