
Maximizing Efficiency in Modular Manufacturing: A Process Optimization Success Story
The Challenge: A Complex, Inefficient Business Process
A consortium of 20+ modular manufacturing facilities struggled with a legacy business process that was inefficient, outdated, and insufficient for managing complex, large-scale construction projects. From lead generation to project completion, inefficiencies slowed the entire pipeline, limiting growth and profitability.
​
The Solution: Lean Six Sigma Process Mapping & Optimization
Using Lean Six Sigma principles, I conducted a comprehensive end-to-end process mapping initiative:
-
Performed in-depth qualitative interviews with sub-process owners to uncover inefficiencies and hidden roadblocks.
-
Mapped the entire business process, detailing inputs, outputs, dependencies, sub-process timing, and critical handoffs to gain full operational visibility.
-
Analyzed bottlenecks, delays, and inefficiencies, identifying areas for compression and streamlining.
-
Designed an optimized process map, reducing handoffs, eliminating waste, and improving coordination across manufacturing sites.
The Results: An 80% Reduction in Business Development Cycle Time
-
Lead-to-Win time reduced by over 80%, accelerating revenue generation.
-
Improved cross-facility coordination, ensuring projects move seamlessly from sales to production.
-
Enhanced visibility across the entire pipeline, enabling proactive management and decision-making.
The Competitive Advantage: Faster Sales, Faster Projects, Greater Profitability
By optimizing the full business development process, my client dramatically increased efficiency, reduced delays, and positioned itself for scalable growth.